Multi-functional Pile Driver
Multi-functional Pile Driver
Multi-functional Pile Driver
Multi-functional Pile Driver
FOB
MOQ:
1
Shipping:
Land freight, Ocean freight
Product details
Attachments
FAQ
Essential details
MOQ:1
Lead time:90 days
Shipping:Land freight, Ocean freight
Product Introduction
  1. The dual functions of the rotary drilling rig and the vibro pile driver can be realized.

  2. Combined construction with rotary drilling rig and vibro pile driver

  3. Meet the requirements of the top and bottom feed methods under the vibro working conditions.

  4. Optional water-air linkage and other auxiliary pile construction systems

  5. Built-in construction assistance system for safety supervision and recording of construction data under various working conditions

  6. Highly integrated, reducing the number of auxiliary equipment and construction personnel on-site